Complete
|
|
|
|
10' Dome Construction in Pictures
2022
|
|
Observatory from above
Febreary 27, 2016
|
|
Observatory from above
Febreary 27, 2016
|
|
|
Martin and Ed with Dome 2 and the Control Shed
Gentlemen Beautiful Work!
February 2, 2013
|
|
Martin and Ed Install Flashing Under Dome 2
February 2, 2013
|
|
Martin and Ed build Dome 2 Support Structure
February 2, 2013
|
|
Railing Around the Tower Photo by Martin Woodley
January 19, 2013
|
|
|
RoboDome at its New Home
The Second Dome on the Mountain Will be Installed on the Tower
January 12, 2013
|
|
Sierra Chaparral Observatory
January 12, 2013
|
|
New Home for the RoboDome
January 12, 2013
|
|
Martin Injects Epoxy for Pier Bolts, Ed Provides Words of Encouragement...
January 11, 2013
|
|
|
Ed you want one of these? Martin Warming-Up in 20°F Weather,
January 11, 2013
|
|
Fraiming Detail for Dome Support New Year #3
January 5, 2013
|
|
Dome 1 Sunset
New Year #3
January 5, 2013
|
|
Sierra Chaparral Dome 2 Construction New Year #3
January 5, 2013
|
|
|
Tower and Dome Support Framing New Year #3
January 5,2013
|
|
Sunset and the Dome Support Framing Structure
January 5, 2013
|
|
Dome Base Bracing Complete
December 21, 2012
|
|
Uprights for the Deck are in Place
December 15, 2012
|
|
|
Tower Brick Work is Complete
December 10, 2012
|
|
Tower Construction is Underway for a Second Dome
November 2012
|
|
Tower Construction is Underway for a Second Dome
November 2012
|
|
Rif and his Rig
Nov. 2012
|
|
|
Rif digs the trench to bring water from the well
Nov. 2012
|
|
Martin and Ed make a scaffold to raise the pier another few feet
Nov. 2012
|
|
I cut 12" off the tube and now it fits the dome but the preliminary 16" F/3.2 design no longer fits the tube...
...18" tube 36" long...
Back to the drawing board...
Sep. 29, 2012
|
|
A fit check of the new 16" F/3.2 astrograph prelimianry design reveals an issue.
The tube is too large and another design will be needed... So its back to Zemax modeling. And it looked good in the CAD model???
Sept. 29, 2012
|
|
|
Mike brings his New AP 175 to the site for a few nights of imaging September 2012. Mike comments: "It was the first trip to the field in 2 years and the first trip ever with this setup. To me its seems the scope, mount and camera are a perfect match." |
|
|
|
Spectacular monsoon lightning display on the eastern and southern horizon, lights up the sky
July 14, 2012
|
|
Moon rise before eclipse over Sierra Chaparral Obeservatory
June 3, 2012
|
|
Afternoon Storm Arrives
March 31, 2012
|
|
|
Control Shed and Out House
March 24, 2012
|
|
Temporary Setup for The Night
March 24, 2012
|
|
Floor Installation Complete
March 24, 2012
|
|
Inside Painting Complete and Floor Delivered
March 17, 2012
|
|
|
Delivering the Floor during a spring snow flurry
March 17, 2012
|
|
Moon Over the Control Shed
March 3, 2012
|
|
Seeing Monitor "with dew heaters" Reinstalled on the Tower
Feb. 26, 2012
|
|
Across The Meadow
Sun Rise Sierra Chaparral
Feb. 26, 2012
|
|
|
Seeing Monitor Frozen
Clear Need for a Dew Heater
Feb. 13, 2012
|
|
Control Shed is Dry Walled
Feb. 13,2012
|
|
Sunset Sierra Chaparral
Feb. 13, 2012
|
|
Loft is Dry Walled
Feb. 13, 2012
|
|
|
Control Rack Wired
Feb 13, 2012
|
|
Wires Entering the Control Rack
Data, 12V, 110V for
Shed and Domes
Feb 12, 2012
|
|
Sierra Chaparral Sunrise from Road
Feb. 12, 2012
|
|
Nine Mile Canyon Moon Set
Feb. 12, 2012
|
|
|
Seeing Monitor and
Sky Quality Meter (SQM)
Some Modifications
Feb 3, 2012
|
|
Sky Quality Meter "left side"
Seeing Monitor "right side"
Some Modifications
Feb 3, 2012
|
|
12Volt Power Distribution and Breaker Drawer
Jan 21,2012
|
|
A New Year #2
Jan 11, 2012
|
|
|
Control Shed Wiring Complete
Dec. 28, 2011
|
|
Seeing Monitor First Light
its "used" but works great
Dec. 27, 2011
|
|
Seeing Monitor First Light
Sierra Chaparral
Dec. 27, 2011
|
|
Moon Set from Nine mile Canyon
Sierra Chaparral 1 year old
Dec. 17, 2011
|
|
|
Ground Bus Bar
Drilling Holes for Connection
Nov. 26, 2011
|
|
View South from the Well
Nov. 26, 2011
|
|
The Well is Complete
243 feet deep 25 gal/ Min.
Thanks Jay...
Nov. 26, 2011
|
|
Control Shed
Nov. 26 , 2011
|
|
|
Clearing Storm Sierra Chaparral
Note the Solar Panels are Snow Free and Producing Energy at 10:00AM
Nov. 12 , 2011
|
|
Clearing Winter Storm
Nov. 12 , 2011
|
|
Sierra Chaparral Observatory
Control Shed Weathers its first Winter Snow Storm.
8:30AM
Thanks Martin and Ed..!!
Nov. 12 , 2011
|
|
Across The Meadow
Sierra Chaparral Observatory
Overnight storm drops about 6" of snow
Nov. 12 , 2011
|
|
|
Cold but Still Nice and a Little Snow Falls
Nov. 11 , 2011
|
|
Cold but Still Nice and a Little Snow Falls
Nov. 11 , 2011
|
|
Pam Visits Its Cold but Still Nice
Nov. 11 , 2011
|
|
Pam Visits; It Might Snow
Nov. 11 , 2011
|
|
|
Jay and Sue's Well Drilling Rig
Oct. 22, 2011
|
|
Dad and Jay Discuss Drilling a Well
Oct. 22, 2011
|
|
Dad Approves Solar Panel Installation
Oct. 22, 2011
|
|
Mom Robin Make Lunch
Oct. 22, 2011
|
|
|
Mom Robin and the 8" F/2.6
Sierra Chaparral Observatory
Oct. 22, 2011
|
|
Mom Robin and I
Sierra Chaparral Observatory
Oct. 22, 2011
|
|
Dad and Mom Visit Sierra Chaparral Observatory
Oct. 22, 2011
|
|
Martin Completes the Solar Panel Wiring
Oct. 15, 2011
|
|
|
Ed and Martin Solar Panels Installed
Oct. 15, 2011
|
|
Ed and Martin Install the Solar Panels
Oct. 15, 2011
|
|
Rails for the Solar Panels are Installed
Oct. 12, 2011
|
|
Solar Panels Arrive
Oct. 8, 2011
|
|
|
Control Shed Ready for Solar Panels
Oct. 1, 2011
|
|
Martin and Ed Install the Weather Station
Oct. 1, 2011
|
|
Martin Bolts Down the All Sky Camera
Oct. 1, 2011
|
|
Martin and Ed install the All Sky Camera
Oct. 1, 2011
|
|
|
Clearing Sunset Storm
Sierra Chaparral
Sep 30, 2011
|
|
Clearing Storm at Sunset
Sierra Chaparral
Sep 30, 2011
|
|
Stormy Sunset at Sierra Chaparral
Sep 30, 2011
|
|
Road to Sierra Chaparral
Sep 30, 2011
|
|
|
Control Shed
Sep 30, 2011
|
|
Culvert Installed
Sep 20, 2011
|
|
Metal Roof Installed
Sep 20, 2011
|
|
All Set for the Roof
Sep 17, 2011
|
|
|
Dome and Rail Work
Sep 17, 2011
|
|
Out House Framing
Aug. 24, 2011
|
|
Ed and Martin Out House Framing
Aug. 24, 2011
|
|
Construction of the Out House
Aug. 24, 2011
|
|
|
Control Shed toward the North West
Aug. 5, 2011
|
|
Control Shed and Dome Toward North West
Aug. 5, 2011
|
|
Martin Working the Battery Shack Roof
Aug. 5, 2011
|
|
Ed Cuts Roof Supports for Battery Shack
Aug. 5,2011
|
|
|
Ed And Martin Working the Battery Shed
Aug. 5, 2011
|
|
Control Shed with Door South East View
Aug. 5, 2011
|
|
A Bit Of Afternoon Rain Tests Things
Just a few hours earlier SQ 21.87 under cloudless skies
July 30, 2011
|
|
Control Shed Dome and A Bit More Layout Facing North
Sunrise Note the Clear Sky
July 30, 2011
|
|
|
Control Shed Dome and Telescope North Facing
July 29, 2011
|
|
Rif Risks His John Dee re and Teaches Me to Dig
July 23, 2011
|
|
Control Shed Dome and Telescope North Facing
July 23, 2011
|
|
Control Shed Framing Toward West
July 22, 2011
|
|
|
Control Shed
July 11, 2011
|
|
Sierra Chaparral
July 11, 2011
|
|
Testing Electronics and Software
July 3 , 2011
|
|
Control Shed and Dome Toward East
July 1 , 2011
|
|
|
Control Shed and Pier Toward South East
July 1 , 2011
|
|
Control Shed and Pier Toward South West
July 1 , 2011
|
|
Control Deck and Dome Toward North West
May 28, 2011
|
|
Control Deck and Pier Footing
May 28, 2011
|
|
|
Control Deck, Sunrise
May 28, 2011
|
|
Control Shed and Fence
May 28, 2011
|
|
RoboDome with Camera Back Yard Testing
May 22, 2011
|
|
Pam Checks Progress
May 15, 2011
|
|
|
Martin and Ed Have the Fence Complete on the West Side
May 14, 2011
|
|
ME, the Dome, and an AP1200
Measurements for Pier 1 Design and Some Dome Adjustments, Thanks Dennis and Jim
May 14, 2011
|
|
Pier 2 and RoboDome
May 11, 2011
|
|
Dome from Road Looking East
May 7, 2011
|
|
|
Dome from Tower Pad Looking South
May 7, 2011
|
|
Martin and Ed Install the First Dome on the Mountain
May 7, 2011
|
|
Some Encouragement from the Neighbors
May 7, 2011
|
|
Martin and Ed Get Things Ready for the Dome
May 7, 2011
|
|
|
After (2) Days on the Road I Arrive with the Dome from Light Buckets thanks Steve
May 7, 2011
|
|
First Night on the New Slab
April 29, 2011
|
|
Batteries Arrive
April 22, 2011
|
|
Concrete Work Complete Except a Couple of Footings
View Due South
April 21, 2011
|
|
|
Rif Smoothing Ruts from the Heavy Concrete Load
April 21, 2011
|
|
Martin, Ed, and Tractor Working the Concrete for the Battery Shed Slab
April 21, 2011
|
|
Martin, Tractor, and Ed Working Concrete for Pier 1
April 21, 2011
|
|
Early Morning Truck Arrival and We are Ready to Pour Concrete
April 21, 2011
|
|
|
Forms View Toward North West
April 16, 2011
|
|
Out House and Walk Way Forms
April 16, 2011
|
|
Pier 2 Forms
Clay is hard to move and the forms make 4 feet. A lot of work Thanks Martin, Ed, and Rif
April 16, 2011
|
|
Pier Layout Complete
April 2, 2011
|
|
|
Polaris Alignment Check
Waiting for Dark
"Trust but Verify"
April 2, 2011
|
|
Telescope Field Layout
Aligned to Polaris
Thanks Martin and Ed...
March 2011
|
|
Do What? Align To Polaris?
Isn't that an off road vehicle?
Martin and Ed
March 2011
|
|
Road Graded
Thanks Rif...
March 2011
|
|
|
Telescope Field Graded
March 2011
|
|
Star Testing Prior to Grading
March 2011
|
|
Future Telescope Field
Year #1
Feb. 2011
|
|
A little Prep for Grading
Year #1
Feb. 2011
|
|
|
Sierra Chaparral Site
Close of Escrow Dec. 17,2010
Thanks Thomas...
|
|
Sierra Chaparral Site Test
Wayne and I test the site
SQ 21.87
Dark Sky Night Sept. 2010
|
|
Sierra Chaparral Parcels 1&2
July 2010
|
|
|
|
|
|
|
Photos |